September 30, 2025
Bangun 1 Juta Rusun, Investor Qatar Pakai Lahan KAI
Jakarta - Investor asal Qatar, Al Qilaa International Group (Al Qil...
Read more
RCON as the business expansion of PT. Risjadson Land in construction and development sector, are committed to deliver excellent business practice with the adoption of modern methods of construction and technologies. RCON has successfully expanded its operation to Malaysia, Philippines, and Australia. The RCON team brings extensive experience from numerous manufacturing projects.
To implement the next-generation property development and construction projects that embrace the transformative power of a scalable and sustainable digital project ecosystem platform, enabled by the adoption of Modern Methods of Construction (MMoC) and IR4.0 technologies in our integrated BIM-based Design-Assemble-Manage (DAM) Project Delivery Model.
Ensuring that every stage of a project aligns with environmental sustainability, delivers social value, and is managed with transparent and responsible governance.
DelaysConventional methods are slow, heavily dependent on weather and labor, often pushing projec...
Delays
Conventional methods are slow, heavily dependent on weather and labor, often pushing projects beyond deadlines.
Leakages & Poor Quality
Inaccurate finishing leads to recurring issues such as leakage and frequent maintenance.
Cost Overruns
Inefficient planning and execution frequently blow budgets, leaving investors and developers exposed.
Faster Build – Prefabricated, ready-to-install components cut on-site work and speed up del...
Faster Build – Prefabricated, ready-to-install components cut on-site work and speed up delivery.
Integrated Formwork – No need for separate formwork. Save time, reduce costs, and ensure consistent quality.
Stronger Structure – Precision-engineered for durability, with higher load-bearing capacity and fewer risks of leaks or cracks.
Criteria Modular Shear Wall Formwork Conventional Construction (Timber/Plywood ...
|
Criteria |
Modular Shear Wall Formwork |
Conventional Construction (Timber/Plywood Formwork) |
|
Reusability |
Can be reused 200-300 times, making it very cost-effective over multiple projects. |
Typically reused 10-20 times before needing replacement, especially in harsh conditions. |
|
Precision and Quality Control |
1-2 mm tolerance due to prefabrication; highly consistent across projects. |
5-10 mm tolerance on average, leading to greater potential for inconsistencies in wall dimensions and alignment. |
|
Material Durability |
Lasts 8-10 years depending on care and frequency of use, especially with materials like steel or aluminum. |
Lasts 1-2 years on average, depending on material exposure to weather and concrete. |
|
Safety |
30% lower accident risk, as prefabricated components provide better stability and require less scaffolding and done under controlled environment within the Mod Factory. |
Higher accident risk due to manual handling, misalignment risks, and the need for more scaffolding and shoring. |
|
Complexity of Installation |
2-4 hours to install modular formwork an average wall section, reducing complexity with intuitive assembly. |
6-10 hours to install traditional formwork for the same wall size, requiring cutting, assembling, and fitting on-site |
Criteria Modular Shear Wall Formwork Conventional Construction (Timber/Pl...
|
Criteria |
Modular Shear Wall Formwork |
Conventional Construction (Timber/Plywood Formwork) |
|
Speed of Construction |
25-40% faster due to quick assembly and disassembly. Completion times for walls reduced from weeks to days. |
Slower by 25-40%, especially for large projects, due to the manual nature of building, dismantling, and refabricating formwork. |
|
Labor Requirement |
30-50% less labor required. A team of 5-7 workers can assemble large areas in less time. |
Requires 30-50% more labor, with 8-12 workers needed for assembling and dismantling formwork. More skilled labor required. |
|
Cost Efficiency (Long Term) |
20-30% cost savings over the long term, especially for large-scale or repeated projects due to reduced labor and material replacement costs. |
Higher long-term costs (30-40% more expensive) due to frequent replacements and higher labor and maintenance costs. |
|
Initial Setup Cost |
$100-150/m², higher initial investment, but costs amortized over multiple projects. |
$30-50/m², lower upfront cost, but higher over time due to frequent replacements and higher labor costs. |
We have demonstrated its continued commitment to sustainability and higher standards of manufacturing accreditations.
Indonesia
PUPR
Kementerian Pekerjaan Umum
dan Perumahan Rakyat
Sigap Membangun Negeri

Indonesia
PUPR Technical Recommendations - Indonesia
Landed Housing
High Rise
Get our latest news.
Jakarta - Investor asal Qatar, Al Qilaa International Group (Al Qil...
Read more
Jakarta (ANTARA) - PT Kereta Api Indonesia (Persero) atau KAI bersa...
Read more
JAKARTA, KOMPAS.com - PT Kereta Api Indonesia (Persero) menggandeng...
Read more
TEMPO.CO, Jakarta - Qilaa Global Group, a Qatari company, has offic...
Read moreRCON as the business expansion of PT. Risjadson Land in construction and development sector, are committed to deliver excellent business practice with the adoption of modern methods of construction and technologies. RCON has successfully expanded its operation to Malaysia, Philippines, and Australia. The RCON team brings extensive experience from numerous manufacturing projects.